Nevada Substation Expansion and 138 kV Transmission Lines Partial Rebuild Project (OPSB Case No. 25-0703-EL-BLN)

In this Project, ATSI proposes to expand the existing Nevada Substation for the installation of a four-breaker ring bus. To facilitate this, the Substation will expand from its existing square footage of approximately 25,478 square feet to approximately 44,926 square feet. This will result in an approximate 76.3 percent increase in square footage. As part of the Project, the existing Boardman-Sammis 138 kV Transmission Line connection to Nevada Substation will be relocated to the east side of the substation as part of the reconfigured Nevada Substation. This transmission line relocation will require the modification of one (1) existing structure, the installation of three (3) new steel monopole structures on concrete foundations and the removal of eight (8) wood poles and of the line conductor from Structure 14079 to the substation. The Project is in Boardman Township, Mahoning County Ohio.

Project Documents

A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-888-311-4737 or by email. Please reference the project name and case number (25-0703-EL-BLN) in all communications.