Leroy Center-Mayfield Q1 and Q2 138-kV Transmission Lines (Phase 2) project (OPSB Case No. 24-2383-EL-BLN)
In this project, ATSI is proposing to reconductor an approximately 7.3-mile segment of the existing 15.7-mile double-circuit Leroy Center-Mayfield Q1 and Q2 138-kV transmission lines, extending from Structure 7056 (Pawnee Tap) to the Mayfield Substation. The project will encompass replacing the existing 4/0 AWG 7 strand copper conductor with 336.4-kcmil 26/7 ACSS conductor. The project scope will not include any replacement of structures. The project is in the existing transmission corridor in Chardon, Munson and Chester townships in Geauga County, Ohio.
A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. A request for a paper copy can be made by contacting the transmission project hotline at 1 888-311-4737 or by email. Please reference the project name and case number (24-2383-EL-BLN) in all communications.