East Fayette-Stryker 138-kV Transmission Line Structure Replacement Project (OPSB Case No. 25-0163-EL-BNR)

In this Project, ATSI proposes to replace and relocate one wood pole structure on the East Fayette-Stryker 138 kV Transmission Line approximately 30 feet south of the existing structure location along the same centerline. The existing conductor and static wire will be transferred to the new structure. The structure supports both the East Fayette-Stryker 138 kV Transmission Line and the Snyder-Stryker 69 kV Transmission Line. The structure is being replaced as part of the Snyder-Stryker (West Unity) 69 kV Transmission Line Rebuild Project. The Project will be located within existing right-of-way in Springfield Township, Williams County, Ohio.

Project Documents

A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1 888-311-4737 or by email. Please reference the project name and case number (25-0163-EL-BNR) in all communications.