Chrysler-Dowling 138-kV Transmission Line Tap Extension to New First Solar Substation Project (Case No. 17-1674-EL-BNR)
A FirstEnergy affiliates, American Transmission Systems Inc. and Toledo Edison, are proposing to install a new approximately 260-foot long transmission line extension from the existing Chrysler-Dowling 138-kV transmission line tap to a new substation being constructed by First Solar on its property. The project is located in Perrysburg Township, Wood County, Ohio.
A paper copy of the application can be supplied within 5 business days upon request at no more than the cost or printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by email. The project name and Case Number (17-1674-EL-BNR) should be referenced in all communications.