Chrysler-Dowling 138 kV Transmission Line Switch Replacement Project (OPSB Case No. 25-0515-EL-BNR)

In this Project, ATSI is proposing to replace two existing switches on the existing Chrysler-Dowling 138 kV Transmission Line. The existing switches, Nos. A-13109 and A-13110 are currently mounted on the same structure, Structure No. 91-3, that serves as the transmission line tap structure to Lime City Substation. These switches will be replaced and installed on two (2) new single circuit steel monopole switch structures on concrete foundations, one on each side of Structure No. 91-3, will be a modified tap structure. The new switch numbers will be A-747 and A-748. In addition to the new switches and switch structures, a midspan structure on a concrete foundation will be installed on the 138 kV transmission line tap to the Lime City Substation. The existing conductors and static wires will be transferred to the new structures. The Project is in Perrysburg Township, Wood County, Ohio.

Project Documents

A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1 888-311-4737 or by email. Please reference the project name and case number (25-0515-EL-BNR) in all communications.