Avery-Hayes 138-kV Transmission Line Rebuild Project - Case No. 25-1038-EL-BLN
In this Project, American Transmission Systems, Incorporated (“ATSI”), a FirstEnergy company, proposes to rebuild the existing approximately 6.5 miles long Avery-Hayes 138 kV Transmission Line. The rebuild Project will consist of 47 structure replacements, and conductor and shield wire upgrades. The Project is located in Perkins, Oxford, and Milan Townships in Erie County, Ohio.
Project Documents
A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-888-311-4737 or by email. Please reference the project name and case number(25-1038-EL-BLN) in all communications.