Allen Junction-Westgate 138-kV Relocation Structure Relocation-ODOT Project (OPSB Case No. 25-0111-EL-BNR)

In this project, ATSI is proposing to relocate an approximately 1,404 feet (0.3 mile) long section of the existing Allen Junction-Westgate 138 kV Transmission Line. To facilitate this, ATSI will relocate seven existing 138 kV transmission line structures along this section of transmission line. ATSI needs to shift the centerline and structures approximately 5’- 12’ from their current location except for structure #TS-2, which requires an approximate 27’ centerline and structure shift. The project is necessary to support the Ohio Department of Transportation (“ODOT”) reconstruction and reconfiguration project for the SR 51 Interchange at US 23. The project is in the city of Sylvania, Lucas County, Ohio.

Project Documents

A paper copy of the application can be supplied within five business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1 888-311-4737 or by email. Please reference the project name and case number (25-0111-EL-BNR) in all communications.