London-Tangy 138 kV Transmission Line Tap to Mitchell Delivery Point Substation Project (OPSB Case No. 22-0007-EL-BLN)

In this Project, ATSI is proposing to extend a tap from the existing London-Tangy 138 kV Transmission Line approximately 400 feet (0.08 mile) to a new substation for the Union Rural Electric Cooperative (“UREC”), which will be known as the Mitchell Delivery Point Substation. The transmission line tap will require removal of one (1) structure and installation of four (4) new, embedded single-pole wood structures consisting of one (1) tap structure and three (3) switch structures. The Project is in Jerome Township, Union County, Ohio.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1‑888-311-4737 or by e-mail. Please reference the project name and case number (22-0007-EL-BLN) in all communications.