Kirby-Roberts 138-kV Transmission Line Loop to Crissinger Substation Project, (Case No. 19-0803-EL-BLN)


A FirstEnergy affiliate, American Transmission Systems, Incorporated, a FirstEnergy company, is proposing to construct approximately 6,900 feet (1.31 miles) of new transmission line to loop the existing Kirby-Roberts 138-kV transmission line into the Crissinger Substation. In addition, the project will expand Crissinger Substation from a four breaker ringbus configuration to a six breaker ringbus configuration requiring an approximately 11.8% expansion of the substation. The project will be located in Pleasant Township, Green Camp Township, and Marion Township, Marion County, Ohio.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by e-mail. Please reference the project name and case number (19-0803-EL-BLN) in all communications.

 

Last Modified: April 17, 2019