A FirstEnergy affiliate, American Transmission Systems Inc., is proposing to replace two electric transmission line structures due to localized erosion along Tinker’s Creek in the Village of Valley View, Cuyahoga County, Ohio. This project is needed to maintain the structural integrity of the transmission line. The project involves the replacement of existing steel lattice tower #2914 supporting the Juniper-Newburgh and Juniper-Jennings 138-kV Transmission Lines, and existing steel lattice tower #2218 supporting the Juniper-Pleasant Valley 138-kV transmission lines, with two steel monopole structures on concrete foundations designed to withstand flooding conditions.  

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost or printing and shipping.  Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by email. The project name and Case Number (17-2013-EL-BNR) should be referenced in all communications.