Juniper-Newburgh/Juniper-Jennings & Juniper-Pleasant Valley Q1 & Q2 138-kV Transmission Line Structure Replacement Project (Case No. 20-1647-EL-BNR)

In this project, ATSI is proposing to replace the existing double circuit steel lattice towers #2217 and #2915, associated with the Juniper-Newburgh 138-kV, Juniper-Jennings 138-kV, Juniper-Pleasant Valley 138-kV Q-1 and Q-2 transmission lines, each with one steel monopole structure on concrete foundations. The structure replacement is needed due to the erosion of the bank along Tinker’s Creek creating stability issues for the transmission structures. The project is located in the Village of Valley View, Cuyahoga County, Ohio.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost or printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at  1-800-589-2837 or by email. The project name and Case Number (20-1647-EL-BNR) should be referenced in all communications.