This project involves construction of two 345-kV overhead transmission line loops from adjacent existing 345-kV transmission lines approximately 0.35 miles to the new interconnecting switchyard for the Clean Energy Future- Lordstown facility which will be known as the Lordstown Substation.

The project will also include the raising of existing 138-kV transmission lines within the corridor to allow for the Clean Energy Future 345-kV transmission line loops to cross underneath and connect the Lordstown Substation and the Lordstown Energy Center.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost or printing and shipping.  Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by email. The project name and Case Number (16-1455-EL-BLN) should be referenced in all communications.