The Former Burger 138 kV Transmission Lines Extension to Holloway Substation Project, (Case No. 19-0985-EL-BLN)


A FirstEnergy affiliate, American Transmission Systems, Incorporated, a FirstEnergy company, is proposing to construct approximately 0.27-mile-long new transmission line extensions from the deenergized former Burger-Harmon No.2, Burger-Cloverdale No. 1, and the Burger Line Loop transmission lines into AEP’s Holloway Substation. The project also includes converting the existing deenergized transmission lines to a six wire configurations on the existing structures for approximately 2.51 miles. In addition, two new structures will be constructed at the southern end of the deenergized transmission lines to connect to AEP’s proposed Dilles Bottom-Holloway and George Washington-Holloway 138-kV transmission lines, which the Board considered and approved on August 22, 2018 in Case No. 18-0603-EL-BLN. Finally, south of the interconnection point between AEP and ATSI, approximately 0.93 miles of the deenergized transmission lines will be removed. The project will be located in Mead Township, Belmont County, Ohio.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at  1-800-589-2837 or by e-mail. Please reference the project name and case number (19-08985-EL-BLN) in all communications.

 

Last Modified: June 12, 2019