A FirstEnergy affiliate, American Transmission Systems Inc., is proposing to install an approximately 385-foot temporary bypass from the existing Brookside-Longview West 138-kV transmission line to a mobile distribution substation that will be located at the existing Madison Substation. This temporary bypass will serve as a tap to the mobile substation, which will continue to serve customers, while the Madison Substation undergoes ring bus improvements. The tap will be removed once the substation work is completed. As a part of the project, four temporary single-wood poles will be installed. These temporary facilities will be constructed on property owned by Ohio Edison, a FirstEnergy company, and no new easements will be needed. The project will be located in Madison Township, Richland County, Ohio.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost or printing and shipping.  Request for a paper copy can be made by contacting the transmission project hotline at 1-800-589-2837 or by email. The project name and Case Number (17-1954-EL-BNR) should be referenced in all communications.