Brim Substation Expansion Project (Case No. 19-1177-EL-BLN)

A FirstEnergy affiliate, American Transmission Systems Inc., is proposing to expand the existing substation to improve reliability and operational flexibility in the project Area. The substation expansion will be located on Toledo Edison owned property. The proposed project is located in Plain Township, Wood County, Ohio.

Project Documents

A paper copy of the application can be supplied within 5 business days upon request at no more than the cost of printing and shipping. Request for a paper copy can be made by contacting the transmission project hotline at  1-800-589-2837 or by e-mail. Please reference the project name and case number (19-1177-EL-BLN) in all communications.