Supplier Registration

Any Electric Generation Supplier (EGS) seeking to obtain Coordination Service in the Metropolitan Edison Company (Met-Ed) and Pennsylvania Electric Company (Penelec) service territory must complete and deliver the following contractual agreements and/or documents to the operating company:

1. EGS must be licensed by the Pennsylvania PUC to serve Met-Ed and Penelec customers and must provide a copy of the license.

2. An executed Individual Coordination Agreement Rider as found on page 34 of the Electric Generation Supplier Coordination Tariff (pdf) (in triplicate)

3. An executed Non-Disclosure Agreement.

4. An executed Scheduling Coordinator Designation form as found on page 38 of the Electric Generation Supplier Coordination Tariff (pdf) and Non-Disclosure Scheduling Coordinator form (only applicable if EGS elects to use a Scheduling Coordinator).

5. Written evidence to the operating company of being a signatory to the Operating Agreement and Reliability Assurance Agreement of the PJM Interconnection, L.L.C. (only applicable if EGS elects not to use a Scheduling Coordinator).

6. A completed Supplier Communication Details form.

7. Rate information (only applicable for rate-ready billing). Complete the Rate Design form.

8. Complete creditworthiness obligations.

 

9. Completed W-9 Form (Instructions for the Requester of Form W-9).

 

10. Banking information (Bank Name, Routing Number, and Account Number) provided on company letterhead with a signature.


Upon delivery of registration application and review of documents, you will be contacted to complete EDI Testing. Please visit our Technical Support - EDI page for additional information.

Completed contractual agreements and all documentation must be delivered to:

FirstEnergy

Supervisor, Supplier Services
76 S. Main St.
Akron, OH 44308

(330)761-4348 (Telephone)
(330)315-8664 (Fax)

Delivered is defined as certified mail, hand delivery, or overnight express package delivery service.

Supplier User Manual
Supplier Energy Obligation (pdf)
Supplier Peak Load Share (pdf)
Supplier Peak Load Share Sample Calculations (pdf)
Met-Ed Factors and Examples (pdf)
Penelec Factors and Examples (pdf)

 
If you have questions concerning the necessary agreements or information to be provided, please contact Supplier Support at (330)761-4348 or send an e-mail to: SupplierSupport@firstenergycorp.com.

 