FirstEnergy wholesale load interconnections
All proposed delivery points must comply with the technical requirements detailed in requirements for transmission connected facilities (pdf).

New or materially changed load-serving delivery points to the FirstEnergy transmission system will need to submit an application to FirstEnergy. Each application will be studied in the order received, in the same manner, with good utility practice and with due diligence in each instance.

View the complete FirstEnergy wholesale load interconnection process flow document (pdf).

Please print the FirstEnergy wholesale load interconnection application (pdf) locally and send to:

Mr. Michael Thorn
76 South Main Street
10th Floor
Akron, Ohio 44308-1890


If you have any further questions, contact:

FirstEnergy wholesale load interconnection contact    
Contract Administration: Michael Thorn   feconnect@firstenergycorp.com
330-384-3889

 

(07/02/09)

News